Back to British Columbia
British Columbia Class 7 Practice Test
Full test preview Question 1 of 50
0 answered 50 remaining
Passing target: 80% (40/50)
Warning, construction and railway signsStandalone practice
You pass a sign ending a temporary construction-zone speed limit. What speed should you use next?
Correct answer: The regular posted limit, or less for conditions
Why
The temporary construction restriction ends, but other speed limits still apply. Increase speed only when safe for the traffic, road and visibility.
Verified against Learn to drive smart: your guide to driving safely · Warning, construction and railway signs · p. 46
Report a question issueContinue learning
Related B.C. questions
What does the bed symbol on this blue service sign identify?What does this warning sign with two upward arrows mean?What does this BLASTING ZONE sign instruct a driver with a radio transmitter to do?A warning says the road ahead has a bump or rough surface. How should you respond?What does this CONSTRUCTION advance warning mean?What does this worker symbol with MAXIMUM 50 km/h require?