Trusted Local AutoFind a Shop
Back to Blog
EV

Level 2 vs. DC Fast Chargers: Which One Should Your Shop Install?

informational·Comparison Guide··

Sources and scope, as of 2026

This guide draws on Natural Resources Canada, BC Hydro, the U.S. Department of Energy, the Electrical Safety Authority in Ontario and Technical Safety BC. Permit, licence and grant details are for Canada. Level 2 prices are 2020 planning figures, so confirm them before you buy.

Level 2 and DC fast charging side by side

Level 2 and DC fast charging side by side
What to compareLevel 2DC fast charging
Power supply208 or 240 V ACTypically a three-phase AC input
Power per unit (kW, how fast energy flows)Up to 19.2 kWUp to 500 kW
Range addedPer hour: 16 km (10 mi) at 3.4 kW, 32 km (20 mi) at 6.6 kW, 96 km (60 mi) at 19.2 kWPer 30 minutes: about 160 to 320+ km (100 to 200+ mi)
What sets the speedVehicle, battery, charger and conditionsDirect current goes to the battery and bypasses the vehicle's on-board AC converter. Vehicle and charger limits still set the speed.
Plug typesSAE J1772 and NACS/J3400CCS, CHAdeMO and NACS
CostCharger CAD 1,200 to 8,000; installation CAD 1,200 to 15,000 per charger (2020 prices)Get itemized written quotes (see the list below)

Match the charger to how customers use your shop

Customers leave their vehicles for a longer service visit
Level 2 can deliver the energy over the stay. Work out the kWh (kilowatt-hours, the energy unit on your electricity bill) that a visit needs, as in the example below. Then check that the charger power delivers it in that time.
Customers stop for a short time, or your shop is near a highway
DC fast charging can suit these stops. Confirm that the vehicles you serve accept DC charging and that your site has the electrical capacity for it.
Your customers use different plug types
Check which plugs your vehicles use. A charger with one plug type does not serve vehicles with another unless compatible equipment is added.

Did you find what you were looking for?

Get the site assessed before you ask for quotes

Installation cost depends on charger power, the number of ports, site works and electrical needs. Start with an electrician or electrical engineer who can assess your available capacity and the chargers you propose. The design may use existing capacity, upgrades or managed sharing.

What each written quote should list

  • Charger equipment, with the power of each unit
  • Number of vehicles that can charge at once
  • Electrical work and any utility upgrade
  • Site works, and the permits and notices your province requires
  • Network, payment and maintenance fees
  • Service agreement terms

Worked example: electricity for a two-hour Level 2 visit

A Level 2 charger at 6.6 kW adds about 32 km (20 mi) of range per hour. If the car accepts the full 6.6 kW, a 2-hour visit delivers 6.6 kW × 2 h = 13.2 kWh and adds about 64 km (40 mi). If your electricity costs CAD 0.12 per kWh (use your own rate), that energy costs 13.2 × 0.12 = about CAD 1.58. Demand charges can depend on your peak power, not only on the energy you sell, so ask your utility for your current tariff. Add network, payment and maintenance fees to the same sum.

Electrical licence and permit rules by province

Electrical licence and permit rules by province
ProvinceWho may installPermit or notice
OntarioNormally a licensed electrical contractor. Check the licence. Specified exemptions exist.Notify the Electrical Safety Authority before work starts. This covers almost all electrical work.
British ColumbiaOnly licensed electrical contractors may install EV chargers in commercial buildings.An electrical installation permit in most cases, also for system upgrades.
Other provincesRules differ by province.Set by each province.

Grants and rebates for shop chargers

Charger grants and rebates open, close and change their amounts often. Before you buy or install, ask your electric utility, your provincial government and the federal charger program which programs are open for your site. Some programs, such as the BC Hydro workplace rebate, need approval before you buy or install, so ask before you sign a quote.

Related shop planning guides

What to decide first

  • Choose by the energy a visit needs: Level 2 for longer stays, DC fast charging for short stops and highway sites.
  • Check your customers' vehicles first. Plug type and DC charging support decide who can use the charger.
  • Compare itemized quotes for each charger type before you commit to either.
  • Check which grants are open before you buy. Some need approval first.
  • Ask your provincial electrical safety authority which licence and permit your shop installation needs.

Frequently Asked Questions

Does a DC fast charger need three-phase power?

Usually, yes. DC fast charging equipment typically has a three-phase AC input, and one unit can provide up to 500 kW. The specification sheet of the model you want tells your electrician what the site must supply, so ask for it before you request quotes.

Does every car get the charger's full power?

Not always. When a charger shares its power between connected vehicles, each vehicle can get less than the maximum on the label. A unit with several plug handles may not charge all of them at once.

Can I have Level 2 and DC fast chargers at the same site?

Yes. Some public charging sites in British Columbia offer both fast charging and Level 2, so both types can share a location. Ask installers to quote all the chargers together, so the electrical design covers the full set.

Can a plug-in hybrid use a DC fast charger?

Usually not. Most plug-in hybrids accept Level 2 charging only. Before you plan a DC charger for these customers, look for DC charging in the vehicle manual. Check each model that you want to serve.

Do I need a permit to install an EV charger at my shop?

In most cases, yes, and the paperwork differs. In Ontario, a building permit is separate from the electrical notification, so you may need both. After the work passes, ask your contractor for the Certificate of Acceptance.

Who looks after a charger after it is installed?

The shop that hosts the charger plans this. Cover inspections, repairs and site upkeep, including snow clearing and parking control where they apply. Decide who is responsible for each task and what the service agreement covers before you sign.

Did this post answer your question?

Own an auto shop? Get listed on Trusted Local Auto

Reach local drivers looking for independent, family-owned auto shops and service specialists.

List your shop

Share or ask AI about this article